Services
Bid Packages
Estimates, SOW, hardware lists, rack elevations, and install packages in the JPEG standard.
On every job
Documented the JPEG way
Every job is documented the JPEG way: scope, hardware, rack elevations when a rack is involved, and an install package the techs can work from without pricing.
- A written scope and hardware list
- After-hours scheduling when the site has to be ready before it opens
- Labeled, tested, and photographed when a rack or cabling plant is part of the work

Have a site in mind?
Tell us about the location and the timeline. We will come back with a JPEG bid package.

